Materials · Largo, FL

Concrete tile

Tile is the roof the tile houses were built for. The tile itself lasts fifty years. The underlayment under it does not, which is why most tile jobs here are a tear-off, new underlayment, and the sound tiles relaid.

Lasts
50 years
Typical, medium roof
$26,000 to $42,000
A Mediterranean-style house with a new terracotta concrete tile roof

Concrete tile, tear-off and relay, Dunedin. Illustrative job on this demo.

Concrete tile, close

What moves the number

  1. 01Rotten decking is replaced panel by panel, priced before it goes on
  2. 02A pitch above 7/12 adds a day of roped work
  3. 03A second layer to tear off adds a day and a dumpster
  4. 04A second layer to tear off: adds $1,500 to $4,000
  5. 05Decking replaced, up to ten panels: adds $1,250 to $4,500

Asked about concrete tile

01Can my roof carry tile?

If it has tile now, yes. If it has shingle, an engineer has to say so first. Tile weighs about ten pounds a square foot.

02Do you reuse the old tiles?

Where they are sound, yes, and it takes a good part of the cost out. Cracked and slipped ones are replaced with a match.

03Why is the underlayment the expensive part?

Because the tile has to come off to reach it. The tile is the umbrella; the underlayment is the raincoat, and it is what actually keeps the water out.

One number for your roof, not a range.

The inspection is free. We walk the roof and leave one signed figure on a single sheet.